Making Decisions Under Uncertainty

11 min read · last reviewed 2026-10-17

Open in the interactive app: practice, quiz, mock interview →

In one minute

How it works

Reversible and irreversible

Jeff Bezos's shareholder letters distinguish one-way doors (hard or impossible to undo) from two-way doors (cheap to reverse). Many decisions are two-way doors, but organisations tend to treat them all with one-way caution, which makes them slow. His 2016 letter says that many decisions are reversible and can use a lightweight process, that most should be made with around 70 percent of the information you wish you had, and that "disagree and commit" helps when there is conviction but no consensus (Amazon 2016 letter). In engineering, reversibility is something you can design: feature flags, expand-and-contract migrations, backups and canaries all turn one-way doors into two-way doors, which is why they make teams faster as well as safer.

Expected cost

For each option, list the possible states of the world, estimate their probabilities and the cost of the option in each state, and sum the products. In an incident: you see errors that started 4 minutes after a deploy. Option A, roll back: costs 6 minutes of deploy time whether or not the deploy is the cause. Option B, investigate first: if the deploy is the cause (say 70 percent likely), you lose perhaps 30 minutes of outage before rolling back anyway; if not, you saved a pointless rollback. With 2,000 dollars of impact per minute of outage, rolling back costs about 12,000 dollars in expectation; investigating first costs about 0.7 × 60,000 = 42,000. Even rough numbers make the right move obvious, and they make disagreements specific ("I think the probability is 30 percent, not 70, because..."). Check that the cheap option really is reversible, though. Knight Capital's responders uninstalled the new code from the seven healthy servers, and the SEC found this worsened the problem by making those servers run the old Power Peg code too (SEC order). A rollback is only a two-way door if you know what state it returns you to.

The value of information

Every investigation step costs time. It is worth taking only if its result could change your choice. A simple test: would any answer to this question make me do something different? If not, skip it. Decision theory formalises this as the expected value of perfect information: the difference between the expected cost of deciding now and the expected cost if you could learn the true state first. It is never negative and caps what any real study can be worth, because imperfect information is worth less (EVPI). If even perfect information is worth less than the time it takes to get it, decide now.

Pre-mortems

Before committing to a significant decision, imagine it is six months later and the decision failed badly, then ask everyone to write down why. Psychologist Gary Klein's pre-mortem technique (HBR, 2007) surfaces risks that people hesitate to raise in a normal review, because it makes finding failure modes the task rather than a criticism. Feed the results into the Risk and Change boxes of the decision's SDRC.

Deciding as a group

Under time pressure, consensus is slow. Name the decision owner, gather input briefly, decide, and record the reasoning and the triggers to revisit. "Disagree and commit" means people who argued for another option still support the decision fully once it is made, and the recorded triggers give everyone a legitimate way to reopen it if evidence changes.

Down the stack

Layer 1The contract

A well-made decision has a named owner, a recorded set of options, the key uncertainties with rough probabilities, the chosen option with reasoning, and explicit triggers for revisiting. Reviewers can later judge it against what was known at the time rather than against the outcome.

Layer 2The mechanism

The tools are simple: a decision record (an ADR or an SDRC), a small expected-cost table, and a timebox. Incident processes encode the same logic as rules of thumb: "if a deploy happened in the last hour and errors are user-facing, roll back first" is an expected-cost calculation done in advance, because the probability that the most recent change is responsible is high and the cost of a rollback is low. Error budgets do the same for release decisions: when the budget is spent, the expected cost of more risk is judged too high, and releases pause. Google's guidance lists the typical responses as prioritising recent reliability bugs, working only on reliability until the service is back within its SLO, and a production freeze, with named owners and an escalation path for disagreements (SRE Workbook, Implementing SLOs).

Layer 3The machine

Many engineering uncertainties come from measurement limits on the machine itself. Sampled metrics (a 10-second scrape interval) cannot show sub-second spikes; histogram buckets blur latency between bucket edges (a quantile estimate is only as precise as the bucket it falls in, per the Prometheus docs); log sampling at 1 percent can miss rare errors entirely. Knowing these limits tells you how much to trust a signal: an error that appears in 1 percent sampled logs 5 times in an hour probably happened about 500 times, with wide uncertainty. Good decisions account for how the evidence was produced, not just what it says.

Why it's built this way

  1. Certainty is rarely available in time, and delay has a cost.
  2. So decisions must weigh options under uncertainty, explicitly.
  3. Reversibility changes how much certainty you need, and can be engineered.
  4. Information is worth gathering only if it could change the choice.
  5. Recording reasoning lets teams learn from decisions rather than from luck.

Diagram

flowchart TD
  D["Decision needed"] --> R{"Reversible cheaply?"}
  R -->|yes| F["Decide fast, monitor, revisit"]
  R -->|no| O["List options and states"]
  O --> E["Estimate probabilities and costs"]
  E --> V{"Could more info change the choice and is it worth the delay?"}
  V -->|yes| I["Timeboxed investigation"]
  I --> E
  V -->|no| C["Choose lowest expected cost"]
  C --> REC["Record reasoning and triggers"]

Worked example

A team must choose a queue for a new event pipeline: managed Kafka at about 9,000 dollars a month, or a cloud queue service at about 2,500. The uncertainty is volume: product forecasts 20,000 events a second within a year, but such forecasts are often wrong. Engineers estimate a 30 percent chance of reaching that volume and a 70 percent chance of staying under 5,000 events a second.

If volume stays low, the cloud queue is fine; Kafka wastes 6,500 dollars a month, about 78,000 a year. If volume is high, the cloud queue would need a migration, estimated at 3 engineer-months, about 75,000 dollars plus risk. Expected first-year cost of choosing Kafka now: 0.7 × 78,000 = 54,600 in wasted spend. Expected cost of the cloud queue: 0.3 × 75,000 = 22,500 in likely migration. Cloud queue wins.

Is more information worth it? If they knew volume would be high, they would pick Kafka and avoid the migration, saving 75,000 in that 30 percent case: perfect information is worth at most 0.3 × 75,000 = 22,500. A two-week load study would cost about 15,000 in engineering time and not give perfect information. They decide now, make the choice more reversible by putting a thin publishing interface in front of the queue, and record a trigger: revisit if sustained volume passes 8,000 events a second.

In the wild

Trade-offs

ApproachStrengthsWeaknessesChoose when
Decide fast on gutVery quickBiased, hard to reviewTrivial and reversible choices
Expected cost tableExplicit, debatable numbersEstimates can be poorModerate to high stakes
Gather more data firstReduces uncertaintyDelay has a costWhen info could flip the choice cheaply
Make it reversible, then decideLowers the stakesEngineering effortOne-way doors you can redesign
Pre-mortemSurfaces hidden risksTakes a meetingSignificant, hard-to-reverse decisions

Pitfalls in production

Leadership lens

Check yourself

  1. Why should rollback usually come before diagnosis when errors start right after a deploy?

    Show answer

    The deploy is the most likely cause and rolling back is cheap and reversible, so its expected cost is far lower than the expected cost of extended outage while investigating.

  2. What question tells you whether an investigation is worth doing?

    Show answer

    Could any result change the decision, and is the value of that change greater than the cost of the delay?

  3. Why is "it turned out badly" not proof of a bad decision?

    Show answer

    Outcomes include luck; a decision is good if it was the best choice given the information and reasoning available at the time.

  4. How can you turn a one-way door into a two-way door in a migration?

    Show answer

    Use expand-and-contract steps, dual writes, flags and backups so each step can be undone, instead of a single irreversible cutover.

Sources and further study

Primary

Systems docs

Books

Other curricula

Free resources